Here is a list of the remaining projects along with the estimated cost for each one that must be taken care of this month.
Projected Budget Breakdown
Concrete additions: $20,000 (bathroom footings and slabs for two cabins)
Framing: $20,000 (bathroom additions, stage, sound booth)
Drywall: $25,000 (all interior cabins)
Flooring install: $10,000 (carpet tiles)
Paint: $5,000 (interior/exterior materials)
Vanity/sinks/counters: $5,000 (cabins, nurse's cabin, couple cabins)
Tubs/showers: $7,000
Excavation: $20,000 (two-lane driveway widening, stump removal, field leveling)
RV sites: $50,000 (septic field, roadway, gravel, land clearing)
Consumers Energy: $6,000 (new meter drop for increased power capacity)
Interior finishes: $10,000
Pole barn completion: $45,000 (additional payment)
Toilets: $2,700
Concrete backfill/underground lines: $9,000 (drain/water lines, trenching)
Septic engineer: $8,000 (county-required)
Plumbing for septic $50,000
Storm Damage Assessment: estimated $5,000 insurance deductible (minimum cost)